Projects / Education Sector / Colaiste Mhuire
Colaiste Mhuire
The Department of Education and Science, inline with their construction programme required a school, designed & constructed within 6 months.
Glenbeigh Construction designed, manufactured (off-site) and constructed a 16,000 sq ft school within this time frame, using Modular System Build technology to comply with the departments requirements. This turnkey project was and is a template for many other successful system build projects built within Ireland over the last 5 years.
| client | location | architect |
| Dept. of Education & Science | Cabra, Dublin 7 | PMCA |
| floor area | programme | role |
| 16,000 sq ft | 10 Weeks (Construction Phase) | Main Contractor, P.S.C.S, Designer |