The Department of Education and Science, inline with their construction programme required a school, designed & constructed within 6 months.

Glenbeigh Construction designed, manufactured (off-site) and constructed a 16,000 sq ft Colaiste Mhuire school within this time frame, using Modular System Build technology to comply with the departments requirements. This turnkey project was and is a template for many other successful system build projects built within Ireland over the last 5 years.

ClientLocationArchitect
Dept. of Education & ScienceCabra, Dublin 7PMCA
Floor AreaProgrammeRole
16,000 sq ft10 Weeks (Construction Phase)Main Contractor, P.S.C.S, Designer